Talk to Our
Experts
AiVORA Techlabs Global Pvt. Ltd. logo, IT and software company in Hubballi

Purchase to Production, Finally Connected

A BLDC motor manufacturer ran purchasing, quality checks, and production as separate manual processes. No single system tracked material from order to finished motor. Odoo ERP changed that.

IndustryAutomobile Component Manufacturing
Timeline1 Month
ServiceERP Implementation (Odoo)

Business Challenges

The client makes BLDC motors. They knew they needed a connected system before growing further. Purchasing, quality, and production were running as separate manual processes, with no single system tracking material from order to finished motor.

  • No connected system across purchase, quality, and production
  • No way to check the delivered quantity against what was ordered
  • No formal quality check before material reached the warehouse
  • No clear process for handling rejected material
  • No bill of materials to guide what production needed
  • No automatic link between inventory and production use
  • Manual stock tracking that led to errors
  • No single, trusted set of records for the whole shop floor

What We Delivered

  • Complete Odoo ERP setup: Purchase, Quality Control & Production modules
  • Purchase requisitions that automatically create purchase orders
  • Receipt & GRN tracking to check the ordered quantity against the delivered quantity
  • QC module that inspects incoming material and marks it pass or fail
  • Material sent automatically to the warehouse on pass, or to disposition on fail
  • BOM setup for two BLDC motor types: 1200W and 1500W
  • Material sent from inventory to production, with stock deducted automatically

Our Approach

01

Purchase Requisition & Purchase Order

We set up the purchase module so the process starts with a purchase requisition. Once approved, it automatically creates the purchase order.

02

Receipt & GRN

The receipt shows proof of what was ordered and delivered. A Goods Receipt Note then confirms the actual quantity received against the ordered quantity.

03

Quality Control Workflow

We set up the QC module so the QC team inspects incoming material and marks it pass or fail before it moves further.

04

Warehouse Routing

Material that passes QC goes straight to the main warehouse. Material that fails QC goes to a disposition process, based on the type of material.

05

Bill of Materials & Production

We built the production module around bills of materials for the two BLDC motor types — 1200W and 1500W — to define how each motor is made.

06

Inventory-to-Production Handoff

Once a BOM is approved and production starts, inventory sends the requested material to production, and the on-hand stock is deducted automatically. This closes the loop from purchase through to the finished motor.

Key Outcomes

Full traceability from purchase to production across the BLDC motor line
A formal QC pass/fail check before material reaches the warehouse
Real-time inventory visibility as material moves from purchase to production

Industry context: 74% of manufacturers say they lacked visibility into their operations before switching to ERP — this project closed exactly that gap.

Ready to Bring This Kind of Visibility to Your Shop Floor?

Tell us about your business challenge. We'll help you find the right technology for it.

Enquiry